Roof Installation in Seventh Ward, New Orleans
Creole cottages and shotguns with a deep craft tradition — this is where many of the city’s Creole builders and carpenters lived and worked. Well-made houses, now carrying a lot of covering age.
- Creole cottage and shotgun stock
- Historic craft-trade neighborhood
- St. Bernard and Claiborne corridors

Seventh Ward building stock, and what it means for a roof
The Seventh Ward, running back from the Marigny and Tremé toward Gentilly, was historically the home of the city’s Creole craftsmen — carpenters, plasterers, bricklayers and roofers whose work shaped much of New Orleans. It shows in the housing, which is unusually well built for modest stock: tight cypress framing and careful detailing on ordinary cottages and shotguns.
The framing quality means the structure has generally outlasted several coverings, and the useful work here is almost always about the covering and the details rather than the building. Much of the neighborhood flooded in 2005 and carries the same mixed repair history as Mid-City, with roofs dating from the recovery period now reaching the end of their service life.
Why Seventh Ward roofs fail the way they do
Three things we see repeatedly on this stock — not a generic list, and not the same three as the next neighborhood over.
Recovery-era coverings aging out
Roofs laid in the 2006–2008 rebuild are now at or beyond expected life, and they are failing in numbers.
Original deck boards
Cypress plank decking is durable but gaps open as it ages. Modern underlayment over gapped plank needs the right approach.
Rear addition junctions
Kitchens and bathrooms added to the rear of cottages over the years create low-slope tie-ins that leak before anything else.
Tying new roof into old without causing a problem
Installation is not replacement. The roof has not failed — the building is changing. Different buyer, different risk, different sequence.
- Warranty continuity. Cutting new work into an existing membrane can void the warranty on the part you are keeping. That gets established before anything is opened up, not after.
- Elevation work. Raising a house above base flood elevation lifts it into faster wind. A specification that suited it at grade may not suit it eight feet up.
- Additions and pop-tops. New roof volume meeting an old roof creates junctions that did not exist before. Those tie-ins are where a new-build roof leaks first.
- Rooftop decks and galleries. Traffic-rated assemblies over occupied space are a different system from a roof nobody walks on, and the drainage has to be designed rather than assumed.
- Historic-district infill. New construction inside an HDLC or VCC district is reviewed on how it reads against its neighbors, roof included.
- GC sequencing. Dry-in timing drives everybody else on site. We schedule against the trades that follow us, not in isolation.
Replacement is a different job
If the roof you have has failed and you are replacing like for like, that is a replacement, and it runs differently — different survey, different cost drivers, different conversation about tear-off and decking. See roof replacement instead, and if you land on the wrong one, say so on the call and we will point you at the right one rather than quoting you for the wrong job.
A re-roofing permit is required in Orleans Parish — and three different commissions may review it
Residential re-roofing permits are applied for through the Department of Safety and Permits. Properties inside a historic district require additional review time before the permit is issued.
Four stages, no surprises
Inspection
Someone goes onto the roof. Not a drive-by, not a satellite image — the covering, the flashing, the valleys and the deck condition, looked at directly.
Diagnosis
What has failed and why, traced to the actual entry point rather than the spot where water shows up inside.
Written scope
What we found, what we propose, and what it costs, in writing with photographs. No number quoted cold over the phone.
The work
Carried out to the agreed scope, dried in each day, site cleared, and documented for your records and your insurer.
Working around St. Bernard Avenue, Claiborne Avenue, St. Augustine High School and the surrounding streets. If your address is in Seventh Ward, it is in the service area — there is no travel surcharge anywhere inside Orleans Parish.
Roof Installation near Seventh Ward
Everything else we do in Seventh Ward
Roof Installation in Seventh Ward — straight answers
We are working with an architect and a GC — can you coordinate?
That is the normal arrangement on installation work. Dry-in timing drives the trades that follow us, so we schedule against the program rather than in isolation, and we talk to whoever is running the job.
Will new work void the warranty on the existing roof?
It can, which is why it gets established before anything is opened up. Cutting new work into an existing membrane without checking the warranty terms is a common and expensive mistake on additions and rooftop decks.
We are elevating the house — does that change the roof?
It can change the specification. Raising a building above base flood elevation also lifts it into faster wind, and an assembly that was adequate at grade may need enhanced fixing once it is up. This matters most in Lakeview, Gentilly and the Lower Ninth.
The boards under my roof have gaps — is that a defect?
No, that is original cypress plank decking behaving normally. It was laid with gaps and it has shrunk further over a century, which is fine structurally but does mean the underlayment and fixing approach have to suit it. Fastening a modern covering into gapped plank without allowing for that is a common cause of nail pops and early failure, so it is something we specify for rather than work around.
Roof Installation in Seventh Ward?
Call and we will get someone on the roof, then put what we find in writing.