Roof Installation in French Quarter, New Orleans
Creole townhouses built after the fires of 1788 and 1794, most of them slate or clay tile behind a parapet. Every exterior change here answers to the Vieux Carré Commission, and we plan the job around that from day one.
- Vieux Carré Commission jurisdiction
- Slate and clay tile, repaired not replaced
- Courtyard and gallery access planned

French Quarter building stock, and what it means for a roof
The Quarter is the oldest building stock in the city and almost none of it is original to the French colonial period — the great fires of 1788 and 1794 took most of that. What stands today is largely Spanish-influenced Creole townhouses raised after those fires: two to four stories of brick or stucco, built to the front property line, with courtyards behind and cast-iron galleries over the banquette.
Roofs here mix slate, clay tile and low-slope sections hidden behind parapets and party walls, often all on one building. That matters because the Vieux Carré Commission — which governs the Quarter under its own enabling legislation, separately from the rest of the city’s historic districts — treats what is visible from the street as a preservation question, not a contractor’s choice. Standing seam metal is generally not accepted as a substitute for an existing slate or tile roof here.
Why French Quarter roofs fail the way they do
Three things we see repeatedly on this stock — not a generic list, and not the same three as the next neighborhood over.
Slipped and broken slate
Individual slates work loose long before the roof as a whole is finished. The correct answer on a Quarter roof is usually a matched replacement slate, not a tear-off.
Parapet and party-wall flashing
Buildings share walls on both sides. Water entering at a neighboring parapet shows up inside your top floor, which changes whose repair it actually is.
Hidden low-slope sections
Behind the visible pitched front there is often a flat rear over the service wing. It is the part nobody sees and the part that usually leaks first.
Tying new roof into old without causing a problem
Installation is not replacement. The roof has not failed — the building is changing. Different buyer, different risk, different sequence.
- Warranty continuity. Cutting new work into an existing membrane can void the warranty on the part you are keeping. That gets established before anything is opened up, not after.
- Elevation work. Raising a house above base flood elevation lifts it into faster wind. A specification that suited it at grade may not suit it eight feet up.
- Additions and pop-tops. New roof volume meeting an old roof creates junctions that did not exist before. Those tie-ins are where a new-build roof leaks first.
- Rooftop decks and galleries. Traffic-rated assemblies over occupied space are a different system from a roof nobody walks on, and the drainage has to be designed rather than assumed.
- Historic-district infill. New construction inside an HDLC or VCC district is reviewed on how it reads against its neighbors, roof included.
- GC sequencing. Dry-in timing drives everybody else on site. We schedule against the trades that follow us, not in isolation.
Replacement is a different job
If the roof you have has failed and you are replacing like for like, that is a replacement, and it runs differently — different survey, different cost drivers, different conversation about tear-off and decking. See roof replacement instead, and if you land on the wrong one, say so on the call and we will point you at the right one rather than quoting you for the wrong job.
A re-roofing permit is required in Orleans Parish — and three different commissions may review it
Residential re-roofing permits are applied for through the Department of Safety and Permits. Properties inside a historic district require additional review time before the permit is issued.
Four stages, no surprises
Inspection
Someone goes onto the roof. Not a drive-by, not a satellite image — the covering, the flashing, the valleys and the deck condition, looked at directly.
Diagnosis
What has failed and why, traced to the actual entry point rather than the spot where water shows up inside.
Written scope
What we found, what we propose, and what it costs, in writing with photographs. No number quoted cold over the phone.
The work
Carried out to the agreed scope, dried in each day, site cleared, and documented for your records and your insurer.
Working around Jackson Square, St. Louis Cathedral, The Cabildo and the surrounding streets. If your address is in French Quarter, it is in the service area — there is no travel surcharge anywhere inside Orleans Parish.
Roof Installation near French Quarter
Everything else we do in French Quarter
Roof Installation in French Quarter — straight answers
We are working with an architect and a GC — can you coordinate?
That is the normal arrangement on installation work. Dry-in timing drives the trades that follow us, so we schedule against the program rather than in isolation, and we talk to whoever is running the job.
Will new work void the warranty on the existing roof?
It can, which is why it gets established before anything is opened up. Cutting new work into an existing membrane without checking the warranty terms is a common and expensive mistake on additions and rooftop decks.
We are elevating the house — does that change the roof?
It can change the specification. Raising a building above base flood elevation also lifts it into faster wind, and an assembly that was adequate at grade may need enhanced fixing once it is up. This matters most in Lakeview, Gentilly and the Lower Ninth.
Does the Vieux Carré Commission have to approve my French Quarter roof?
If the work is visible — the slate or tile field, the ridge, coping, or anything facing the street — then yes, it goes through the Vieux Carré Commission, a separate body from the HDLC with its own authority under the Louisiana Constitution. A re-roofing permit from the Department of Safety and Permits is required as well, and historic-district properties take additional review time before that permit is issued. We build that time into the schedule rather than discovering it mid-job.
Roof Installation in French Quarter?
Call and we will get someone on the roof, then put what we find in writing.